TITLE: Intermediate Heat Transport Long Lead Equipment Supplier Oversight Engineer
LOCATION: Bellevue, WA, USA
TerraPower is a nuclear technology company based in Bellevue, Washington. At its core, the company is working to raise living standards globally through a more affordable, secure and environmentally friendly form of nuclear energy along with innovations in medical isotopes to improve human health. In 2006, TerraPower originated with Bill Gates and a group of like-minded visionaries who evaluated the fundamental challenges to raising living standards around the world. They recognized energy access was crucial to the health and economic well-being of communities and decided that the private sector needed to take action and create energy sources that would advance global energy deployment. TerraPower\'s mission is to be a world leader in new nuclear technologies, while developing innovators and future leaders in the nuclear field. As a result, the company\'s activities in the fields of nuclear energy and related sciences are yielding significant innovations in the safety and economics of nuclear power, hybrid energy and medical applications - all for significant human health benefits.
TerraPower is seeking to contract with, via agency vendor, highly motivated and forward-thinking professionals who are interested in focusing on advanced nuclear reactor research and development and influencing change within the nuclear power landscape and bringing forward the critical production of medical isotopes. TerraPower is an Equal Opportunity Employer. We do not discriminate in hiring on the basis of sex, gender identity, sexual orientation, race, color, religious creed, national origin, physical or mental disability, protected Veteran status, or any other characteristic protected by federal, state, or local law. In addition, as a federal contractor, TerraPower has instituted an Affirmative Action Plan (AAP) in an effort to proactively recruit, hire, and promote women, minorities, disabled persons and veterans.
Intermediate Heat Transport Long Lead Equipment Supplier Oversight Engineer:
TerraPower, LLC. is seeking to contract with a highly capable and motivated Long lead equipment supplier oversight engineer. This position reports to the System Design Manager and is focused on integrating and coordinating the work of TerraPower engineers and system suppliers, fostering a collaborative working relationship, and ensuring hardware design meets design intent.
Responsibilities:
MNCJobz.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.