Description
About WSDOT
Washington State Department of Transportation (WSDOT) is the steward of an integrated, multimodal transportation system that helps to ensure people and goods move safely and efficiently throughout the state. In addition to building, maintaining, and operating the state highway system, WSDOT operates the largest ferry system in the nation, manages the world\'s longest floating bridge, and recently completed the world\'s widest tunneling project.
The Opportunity
WSDOT is currently seeking to fill three Transportation Engineer 2 vacancies located in Spokane, WA. These positions support the administration of construction contracts by assisting the Office Engineer and construction teams with change order preparation and writing to ensure compliance with contract plans, provisions, environmental permits, and prompt payment requirements. The successful candidates in these roles, will prepare a variety of reports and other documentation to support safe, reliable, and cost-effective transportation, complete independent review, processing, and transmittal of construction and material documentation, and construction close-out activities. These positions may also perform occasional construction inspections and materials sampling and testing duties.
What to Expect
Among the varied range of responsibilities held within this role, the Assistant Office Engineer/Change Order Writer will:
MNCJobz.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.